After two weeks of Eternal Cons and Pirate Festivals we finally got back to work and finished plastering. Walter installed the floors and fixed the pipes so the hot water flows right.
I wanted to tile all around the window but it looks like that we aren’t going to be able to do that.
Tomorrow we clean up the giant mess in the spare bedroom and prime and paint.
This phase was supposed to be done already!